2000 tonne per day space elevator

Keith Henson proposes “…the design of a moving, non-tapered space elevator cable threaded through a system of pulleys that increase the number of supporting strands as the space elevator approaches geostationary orbit (GEO)”. He gives a link to, I guess, a posting of this paper on the LiftPort forums but for some reason I can’t … Continue reading 2000 tonne per day space elevator